糖心传媒

ABC Builder eNews | 糖心传媒 Company
 
Logo
September 2026
Attend one of Our Builder and Erector Schools!

There is an eQuote update scheduled for Wednesday, September 9, 2026, from approximately 10:00 p.m. to 11:30 p.m. Eastern Standard Time. The site will be unavailable during this update.

Keller Inc Completes Service Center

image

The Bell Ford project, by Authorized Builder, Keller Inc, is a medium-duty truck repair facility built to support modern service operations. It features IMP wall panels and American’s standing seam roof panels, as well as a 10-ton crane.聽

Read Here

Nucor Public Affairs Update

image

Nucor Corporation has released a Federal Policy Update on U.S. trade policy, including the Section 232 tariffs and the Section 301 tariffs.

Read Here

Register for IMP Webinar

Join us for an in-depth look at Insulated Metal Panels (IMPs) with practical insights from a Metl-Span expert.

Understanding Longitudinal Load Path

image

Metal buildings rely on a longitudinal bracing system to safely carry seismic and wind loads into the foundation. This month’s Tips from Engineering breaks down that load path and why accurate Builder information is key to an efficient design.

Read Here

Gain Recognition by Submitting Your Projects

image

Share your projects in our annual Excellence in Design program. This year, each project submitted by October 31, 2026, will be entered into a random drawing for a chance to win a Yukon Solo Stove!聽

Info/Submit

Secure Your Spot in our CICP Trainings

image

Two sessions remain for our 2026 Contractor Installation Certification Program trainings. Join our hands-on training designed to equip you with the required information, skills, and knowledge to supervise onsite installation of our products. Register today!

Info/Register